NI Railway Extension

This was a building to suit the maintenance of the trains, with under floor pits founded on piles.  The underfloor tanking system was supplied by Grace products using preprufe which was placed using our own trained operatives. A reinforced floor was placed, power floated to the required tolerances.

Ballymena, N. Ireland

Complete

Gallery

Related Projects

Fulham FC – Riverside Stand

Stevenage Road, London

Lowestoft Outer Harbor

Lowestoft, England

Platinum Jubilee Leisure Centre

West Drayton

Barsham Water Treatment Tanks

Barsham, Norfolk

Liverpool F.C. – Anfield

Anfield Road, Liverpool

Kings College London

London

Glider Bus Hub Poleglass

Poleglass

Peterhead Harbour Deepening

Peterhead

Grassy Meadows Care Unit

Hayes,Hillingdon,Greater London

University of Ulster

Belfast, N. Ireland

Contact Form

Please enable JavaScript in your browser to complete this form.