The new Platinum Jubilee Leisure Centre in West Drayton in London
Work begun with the construction of 3 no swimming pools
A fully Water Proofed Large One Sided Wall Basement with a use of XYPEC Products (Bentonite membranes and additives) and continued works to upper floors.